Water damage estimates range from a single number on a text message to a multi-page scope. The single number looks easy and tells you nothing. A real estimate lists what will be done, in which rooms, with which equipment, and what is not included.
Use this guide as a checklist when you compare estimates. It is not about prices, which depend on your loss. It is about what the paper should show, so that two estimates can be compared fairly.
Water already inside? Call the 24/7 line.
Call (833) 521-1033Scope by room
The estimate should list each affected room and what will be done there. Extraction, removal of wet materials, cleaning, drying and repair each get their own line. If a room is not listed, it is not included.
Look for square footage or linear footage of materials to be removed, such as drywall, baseboard or flooring. Those numbers let you see how big the job really is.
Water category and why it matters
The estimate should state the water category and how it was determined. Clean water, gray water and black water call for different steps, and the industry standard, ANSI/IICRC S500, uses these categories. If the estimate does not say, ask. Sewage or floodwater changes what can be dried and what has to be removed.
Equipment and monitoring
Drying is measured in equipment days. The estimate should name the equipment, such as air movers and LGR dehumidifiers, give the number of units and the expected days, and say how often moisture is read. A job with no monitoring plan is a job with no way to prove that it is dry.
Contents and pack-out
If belongings need to be moved, cleaned or stored, the estimate should say so. Contents are often scoped as a separate line. Ask what happens to items that cannot be cleaned and how they are documented for your insurer.
Repairs priced separately from drying
Mitigation and rebuild are different phases. A good estimate keeps them apart. That helps with your insurer, and it lets you approve drying right away and decide on repairs after. For what repair lines cover, see wall and drywall repair and hardwood floor repair.
Need help with wet materials? Call the 24/7 line.
Call (833) 521-1033Assumptions, exclusions and change orders
Every estimate rests on assumptions, such as the extent of hidden damage. The document should say what happens if the opened wall shows more water than expected, and who approves added work. Look for a clear change-order process and a list of what is excluded, such as mold testing or plumbing repair.
A quick comparison table
| Estimate feature | Look for | Be careful if |
|---|---|---|
| Scope | Room-by-room lines | A single lump sum |
| Equipment | Named units and days | No equipment listed |
| Monitoring | Moisture readings and logs | No mention of readings |
| Exclusions | Clear list | None given |
| License details | License numbers on the contract | No contractor details |
Read the estimate against the loss
Walk through your home with the estimate in your hand. Does each wet room appear on it? Are the materials you can see, such as carpet, baseboard and drywall, listed? Does the amount of material listed match what you can measure by eye? An estimate that leaves out a room that is clearly wet, or adds one that is not, deserves a question.
Then compare the plan with the cause. A loss from a clean supply line should not be scoped like a sewage loss, and a loss that has been wet for a week should not be scoped like one that was found in an hour. The estimate should reflect the type of water and the time elapsed.
Finally, ask who is accountable. The document should name the company, the person who will supervise the work and the way to reach them at night. An estimate is a promise about a process, and the people behind it matter.
- Check that quantities match the rooms.
- Check that the water category is stated.
- Check that equipment, days and monitoring are listed.
- Check that exclusions and change orders are explained.
Ask for a revised estimate when the facts change
Estimates are written before the walls are opened. If the crew finds more water than expected, ask for a revised estimate in writing before work continues, with the reason and the extra lines. A good company agrees. It protects both sides, because nobody is surprised at the end.
Safety steps while you review an estimate
Reviewing paper is a calm activity, but the house may not be calm yet. Until the structure is dry, keep these steps in place.
- Keep power off to any wet room until it has been checked.
- Keep fans and dehumidifiers on their own dry outlets.
- Keep children and pets out of the work area.
- Keep the photographs and readings in one folder.
- Ask the crew what they need you to leave untouched.
Checking a contractor in New York City
The NYC Department of Buildings notes that a Home Improvement Contractor license from the Department of Consumer and Worker Protection is required for work on any land or building used as a residence, including basements, porches and fences. It recommends that a written contract include the company name, a New York City business address and the license numbers.
Ask for the license number and verify it through the lookup tools the city links. If your building is in a co-op, such as in Bay Terrace, the managing agent may also require proof of insurance before work starts.
Common questions
Should an estimate be a single number?
No. A single number hides what is included. Ask for lines by room and phase.
Why do two estimates differ so much?
They often cover different scopes, equipment or repair levels. Compare line by line.
Is the estimate final?
Only the signed scope is final, and it should explain how changes are handled.
How do I check a contractor's license in New York City?
Use the lookup tools linked from the NYC Department of Buildings and the Department of Consumer and Worker Protection, and ask for the license number on the contract.